CPARS reporting requirement begins at $750K+ for which contract category?

Ship repair/overhaul contracts

Ops support contracts

AE contracts

Construction contracts

CPARS is the system used to document contractor performance and support future source selections. For construction contracts, a CPARS evaluation is required when the contract value reaches or exceeds $750,000. This threshold reflects the greater risk, longer duration, and significant impact of construction work, ensuring a formal performance record is available on major projects. The evaluation typically covers cost and schedule performance, quality of workmanship, safety, and contract administration. Because that $750K+ trigger is specific to construction contracts, this category is the correct choice. Other contract types have different triggers, so the exact $750,000 threshold isn’t applied to them.

Want more questions?

All options are one-time payments.

$12.50

30 day premium pass

All the basics to get you started

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 30 day premium pass access
$30.00 $87.50 usd

6 month DELUXE pass (most popular)

Everything with the 30 day premium pass FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • Everything included in the premium pass
  • $87.50 usd value for $30.00! You save $57.50!
  • + Access to the ultimate digital PDF study guide
  • + 6 months of premium pass access
  • + Priority support
$12.50 $18.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy